CONCRETE / COURT PADS

Concrete basketball court pads in Virginia

The surface beneath the surface: a concrete court pad planned for play, drainage and the selected court system.

Request a project estimate ↗

Start with the court plan

Confirm the finished court layout before setting the slab dimensions. Hoop foundations, sleeves, edge treatments and connections to paths belong on the plan before concrete work begins.

For a tile court, base requirements must match the selected manufacturer system. Thickness, reinforcement, subgrade preparation and drainage should be confirmed for the site; a generic online specification is not a finished construction design.

Review drainage and surface condition

The pad needs a coordinated drainage approach and a finish suitable for the playing system. Water moving through a tile surface still needs somewhere to go at the base. Surrounding grades must not send uncontrolled runoff onto the court.

Already have a concrete pad?

Share its approximate dimensions, age and photos. Cracks, displaced sections, ponding, coatings and adjoining slabs can affect whether it is suitable for reuse. Evaluation comes before promising that a new court can go directly over it.

What to include in your inquiry

Tell us whether the site is grass, soil, gravel or existing concrete; whether demolition is needed; and how equipment can reach it. A narrow gate or long distance from the street may influence placement methods.